Untitled Page
DWA Home Page  
 
Untitled Page

Reports

Technical Reports

Mzimkhulu River Off-Channel Storage Pre-Feasibility Study
Pre-FeasibilityReportVol1-4.zip (31.8 MB)
Pre-FeasibilityReportVol5-7.zip (18.3 MB)

Mzimkhulu River Catchment Water Resources Study
Mzimkhulu River Catchment Water Resources Study.pdf (PDF file, 2.2MB)

Geotechnical and Materials Investigation Report
Geotechnical and materials investigation report_final.pdf (PDF file, 414KB)

Ncwabeni Off-channel Storage Dam Feasibility Study
Ncwabeni_ Design and Cost Estimates_Final.pdf (PDF file, 89MB)
Ncwabeni_Geotechnical and materials_FINAL.pdf (PDF file, 50.5MB)
Ncwabeni_Institutional and financial_Final.pdf (PDF file, 2.3MB)
Ncwabeni_Main Report_FINAL.pdf (PDF file, 8MB)
Ncwabeni_Summary Report_Final.pdf (PDF file, 1.3MB)
Ncwabeni_Water Resources_final.pdf (PDF file, 12MB)

Environmental Assessment Reports

Final Environmental Impact Assessment Report

EIA Report (Final) 12-04-13

 

All documents that are to be lodged in the public domain will be added as the EIA process unfolds.