Documents & Reports
uMWP Report Schematic
Summary Report - Final
Main Report - Final
Inception Report - Final
Hydrological Assessment Report - Final
Groundwater Resources - Final
Water Supply to Local Communities - Final
Possible Water Supply from Smithfield Dam to Surrounding Communities - Final
Community Supply from Smithfield Dam - Comrie Dam - Final
Water Resources Yield Assessment Report - Final
Sediment Yield Report - Final
Sediment Deposition and Impact Report - Final
Water Resource Planning Model Report - Final
Feasibility Design Report Vol1 - Final
Feasibility Design Report Vol2 - Final
Optimisation of Conveyance Report - Final
Dam Position Report - Final
Optimization Scheme Configuration - Final
Cost Model - Final
Dam Type Selection - Final
Climatology - Final
Water Quality & Limnology - Final
Positioning of Gauging Weirs - Final
Route Investigation - Final
Traffic Impact Assessment - Final
Climate Change Impact Assessment - Final
Seismic Hazard Analysis - Final
Seismic Refraction Investigation - Final
Geotechnical Report - Annexure A,B,D
Geotechnical Report - Annexure C
Geotechnical Report - Volume 1
Langa Balancing Dam: Materials and Geotechnical Investigation - Final
Conveyance System: Materials and Geotechnical Investigation - Final
Hydropower Assessment Report - Final
Interim Hydropower Investigation - Final
Institutional and Financial Aspects - Final
Economic Impact Assessment Report
Baseline Socio-economic Assessment - Final
Detailed Socio-economic Baseline Study for the Umgeni WSA - Final
Environmental Screening Report - Final
Record of Implementation Decisions
Raw Water - EIA Report - Final (Nov 2016)
Locality Maps
DEA Approval of Scoping Report
Application Forms (Amended)
Raw Water Affected Properties
Curricula Vitae of EAPs
Raw Water Drawings
Longitudinal Section of Tunnel
EIA Specialist Studies – Raw Water (Appendix H1to H14)
Environmental Management Programme (EMPr)
Database of Interested and Affected Parties (I&APs)
K1 - Final Scoping Report and EIA Phase
K2 Draft EIA Report
Copies of Newspaper Notices
Minutes of Public Meetings – Review of Draft EIA Report
Minutes of Meeting – Trewirgie Farm
Minutes of Blue Swallows Working Group Meeting
Comments and Responses Report
Potable Water EIA Report - Final (Nov 2016)
Amended Application Form
Affected Properties
Curricula Vitae of Environmental Assessment Practitioners (EAPs)
Drawings
Typical Trench Geometry
EIA Specialist Studies – Potable Water (Appendix H1to H14)
I-1 - Pre-Construction EMPr
I-2 Construction EMPr
I-3 Operational EMPr
Database of I&APs
K-1 Final Scoping Report & EIA Phase
K-2 Draft EIA Report
Letter from uMgungundlovu District Municipality
Addendum to the Final the Final EIA Report - Final (July 2018)
Comments from the Department of Environmental Affairs (DEA) on the Final EIA Report
Additional EIA Specialist Studies – Raw Water (Appendix B1to B7)
B1 - Provincial Road R617 Engineering Investigation of Realignment Options
B2 - Noise Impact Assessment
B3 - Vibration Impact Assessment
B4 - Avifauna Bridging Study
B5 - Invertebrate Impact Assessment
B6 - Biodiversity Offset Study
B7 - Declarations of Specialists
Updated EIA Specialist Studies – Raw Water (Appendix C1to C5)
C1 - Terrestrial Ecological Impact Assessment
C2 - Aquatic Impact Assessment
C3 - Agricultural Impact Assessment
C4 - Heritage Impact Assessment
C5 - Social Impact Assessment
Response from Aquatic Specialist to Comments from the DEA
Updated EMPr
Minutes of Meetings with the Kwabhidla Traditional Authority of 10 January and 24 May 2018
Letter to the DEA, dated 28 September 2017 – Assessment of Corridors for the Tunnel Route and R617 Realignment
Main Report - Volume 1
Main Report - Volume 2 (Drawings)
Preliminary Pricing of Potable Water Module Options
Water Demand Projections and Phasing of Infrastructure
Pipeline Design Report - Volume 1
Pipeline Design Report - Volume 2 (Bill of Quantities for Option B2)
Pipeline Design Report - Volume 3 (Bill of Quantities for Option B3)
Pipeline Design Report - Volume 4 (Bill of Quantities for Option M1)
Water Treatment Works Conceptual Design
Revised Mgeni System Operating Rules During uMkhomazi Raw Water Tunnel Shutdowns
Geotechnical Investigation Report - Volume 1 (Raw Water Pipeline)
Geotechnical Investigation Report - Volume 2 (Potable Water Pipeline)
Geotechnical Investigation Report – Volume 3 (Water Treatment Works
Geotechnical Investigation Report – Volume 4 (Mapstone Dam Crossing)
Land Survey and Land Owner Details
Preliminary Pricing of Potable Water Module Solutions to Match Additional Raw Water Module Proposals
Final Report - 20 June 2015